           Offshore SUPER PLATFORM Production RIG

 LARGEST OF ITS KIND! CLASS l  VESSEL.  

Capability

Rated to 20,000 ft; conceptual and detailed design, Rig Design Services; major drilling equipment, National Supply; rig-up,

Derrick

30 ft x 30 ft, rated to 1,000,000 lbs

Drawworks

1600 hp

Rotary

Conventional rotary; 1000 hp top drive

Mud pumps

2 x 1600 hp triplex

  THIS OFFSHORE ‘PRODUCTION’  RIG WILL BE COMPLETELY REFURBISHED AFTER PURCHASE .

*Refurbishment is included in the purchase price.

 


  

 

GENERAL

 

Designation

Xxxxxxxxx TLP

 

Name

Gotham

Country

UK /

Location

LOI- Details will be provided. North Sea Area

Water depth

148

Duty

Drilling, production, accommodation

Status of unit

Production

Unit operator

A UK Energy Co.

Status

Production

Field

Xxxxxxxxx

Type

TLP

Operator

A UK

Owner

Gotham Energy Co. and field partners

Design

TLP (Tension Leg Platform)

Engineering

Brown & Root/VO Offshore

Built/history

Hull, Highlands Fabricators, Nigg; topsides, piles, McDermott Scotland, Ardersier. Constructed   1982-83

Other main contractors

Project services, Bechtel; accommodation/helideck, Sea & Land Pipelines

Delivery

Original Installation… on field July 1984

Start of production

6 August 1984

Basic Description & Design

The platform consists of four main components: the deck structure, a single three-level integrated deck containing the usual drilling and production facilities; hull structure, a six-column semi-submersible structure providing buoyancy and ballasting to maintain platform trim; mooring system, comprising four sets of four vertical tethers running from mooring compartments in the hull to piled and grouted foundation templates on the seabed; and the well template, a 32-slot pre-installed template for pre-drilling with a semisubmersible.

Conservative margins in the original design have allowed a subsequent increase in payload capacity of some 2500 mt; part of this was used to increase water injection capacity in 1991, and part is kept in reserve for possible satellite tie-ins. The principals will be recondition the platform as part of the sales agreement. 

Field application

The original field location produced 34.5° API crude from Brent formation sandstones at about 9700 ft; reserves are estimated at 200 mmbbls recoverable, and peak production of 107,000 bopd was reached in December 1984. The TLP was the first application of the tension leg concept. It is moored over a pre-installed and pre-drilled template. Oil was produced through an export line to  Sullom Voe via South Cormorant; gas was used for platform power and any excess flared.

 

 

MAIN DIMENSIONS

 

 

Hull dimensions

92m long x 74m wide overall

Topsides dimensions

78m x 74m

Height

Overall 277 m from seabed; 53.7 metres to main deck; 64.5 metres to weather deck

Weight

Hull 22,400 mt; 47,400 mt total operating weight plus 1350 mt riser tension; 25,000 mt topsides weight

Air gap

31.5 metres

Columns

65 m high; 4 x 17.2m diam. corner columns; 2 x 14.5m inner columns

Pontoons

Connecting pontoons between columns

Deck area

5772 m2 each level

Draught

30 metres operational

Displacement

61,580 mt

Other components

BOP: Hydraulic wellhead connector, 3 x 16 3/4" 5000 psi Cameron U ram preventers, 1 x 16 3/4" 5000 psi Hydril annular preventer; 500 psi Regan KFDS diverter

 

 

CAPACITIES, PROCESS

 

Process system

A single train system comprising two-stage separation plus a surge tank to remove the small amount of solution gas, most of which is used for platform power; excess gas is flared, although this is expected to occur only at the beginning and the end of platform life; the original flotation cell system has been replaced by Vortoil hydrocyclones for produced water treatment; crude is metered and sent to the export pipeline

Crude oil

110,000 bopd

Gas capacity

Used for power or flared

Produced water

NK; increased in 1991

Water injection

275,000 bwpd at 4000 psi

Gas injection/lift

None

Other capacities

32 well slots

 

 

CAPACITIES, TANK

 

Crude storage

None

 

 

 

CAPACITIES. VARIABLE LOAD

 

Main power

2 x GEC Gas Turbines EAS1 15960 KW each; 1 x Ruston TB 3400 KW; firewater pumps, emergency generator and some rig power by diesel

Propulsion

None

Mooring/jacking system

MOORING TETHERS: 16 x 260mm diameter with 75mm hollowed core; pretensioned to approx. 816 mt each tether; max. operating tension 8100 mt; tethers fabrication, Nissho Iwai TETHER ANCHORING: Tethers anchored to four mooring templates, approx. 250 mt each; dimensions 15.244m square x 6m high; each template piled with 8 piles, 84" diameter x 68m long x WT 50mm, 250 mt each, driven 60m

Control systems

Load and ballast system by dual Ferranti Argus 700 GX computer system; central production and safety monitoring, Ferranti

Riser system

Export riser 12.75"; drilling riser comprising 16.75" 5000 psi triple ram BOP and annular  preventer connected through upper and lower flex joints, riser and slip joints to the subsea wellhead connector and template; production risers comprising a wellhead connector, flex joint, 9.625" x 47 ppf x 100 ksi yield riser pipe with modified integral buttress connections, 13.375"  tensioner  spool, and surface wellhead; passive tension jacks maintain 100,000 lb tension on each riser and can accommodate a vertical stroke of 6 ft, +/- 10° riser top angle, +/- 5° yaw angle, and a tension variation of 40% over 6 ft stroke

Sub sea systems

WELL TEMPLATE: Unitized template with 32 slots, including 4 slots used for levelling; 350 mt; 29m x 12m; design, Vetco Offshore; fabrication, McDermott Scotland; installation, Heerema

Capability

Rated to 20,000 ft; conceptual and detailed design, Rig Design Services; major drilling equipment, National Supply; rig-up, Dan-Smedvig

Derrick

30 ft x 30 ft, rated to 1,000,000 lbs

Drawworks

1600 hp

Rotary

Conventional rotary; 1000 hp top drive

Mud pumps

2 x 1600 hp triplex

 

 

OTHER FACILITIES

 

Cranes

2 x Stothert & Pitt OS200, 50t; 1 x Liebherr BOS 15/350, 15t

Accommodation

239; normal crew around 200

Helideck

For Boeing 'Chinook'

Communications

Tropo system to Scousburgh via Murchison platform, Marconi; SOLAS and main narrow band communications, Inspectorate EaE

Safety features

Fire detection & prevention systems, Wormald

Lifesaving

Lifeboat capacity 500

 

 

OPERATING PARAMETERS

 

Design life

20 years (field life approx. 14 years)

Design criteria

100 year storm: 29.9m wave, period 17 sec, 2.5 knot current, 98 mph wind, all impinging on platform from a 45° angle, give a max. horizontal excursion of 24m

Water depth m

148 metres at Xxxxxxxxx

Production limits

None within design criteria

 

 

PRODUCT EXPORT/DISPOSAL

 

Oil

6 km x 12.75 pipeline to NW Xxxxxxxxx; trenched

 

Gas

Originally not exported; used for fuel or flared; 7.7 km x 6" gas

import line laid 1997

 PRICE

 

OPTION 1. 

 

 Time of Delivery

  $120 MILLION.  FOB SITE.  (INCLUDES REFURBISHMENT. ) *

                       

 TO PROCEED -  LETTER OF INTENT to GLOBAL

 

CHARTER RATE.  $750,000 DAY RATE  5-20 YEAR CONTRACT

Delivery.  18 months approximately.

Refurbishment  will take approximately 14-16 Months from Purchase.

Delivery Optional

REGULATORY

 

Classification

Lloyd's Register

Certification/approvals

Lloyd's Register

 OPTION. Company may consider a Charter Contract to qualified Party.
James Whitsitt, Global Equipment and Finance
214-321-9044
 james.whitsitt@globalequipmentandfinance.com

 

Send mail to jack@dwracinggraphics.com with questions or comments about this web site.
Copyright © 2006 DW Racing Graphics
Last modified: Thursday October 26, 2006