Home
Up
Scope of Services
Equipment
News Items
Resume

       

4000 B/D Portable Plant set in position.

                                       

 Price FOB

Delivery:  The basic process equipment can be ready for shipment within 180 to 210 days.

The main components for each unit will be built after initial order and contract is signed, 60% verified deposit in place, and balance on completion. 

Total time to deliver plant will depend on backlog. The time can be provided upon time deposit is made.

Notes:

All Pumps are Goulds.
Motors are manufacturer's standard.

Electrical load is approximately 350 Kw. 

One (1) year warranty on parts! Shipment.

 1. Processing skid - can be shipped in ocean container. *
              Length - 40'
              Width -    8'
              Height -   8'
  2. *Towers are removed for shipment and shipped in  second ocean container.
 


OPTIONS. 

a.  Additional charge for LPG condenser system. Price quoted. 

b. Additional charge for 12,000 gal., 250 psig, Storage Tank skid mounted,

    8' wide x 28'  long x 12' tall, 27,000# weight.
c. . Engineering fee for system design, to include process  design, detailed engineering drawings, bills of material,  data packages for procurement and construction.

   Price Quoted 

 


Additional Items .

Spare parts for purchase to include:
 Reboiler heater
 Instruments (1 of each)
 Pumps (1 of each)
 Air cooler motor
 Electrical (fuses, starters, switches, etc.)
 Price  on request.

 Contact. James Whitsitt. Global Equipment and Finance Co. 

214-340-9553 /214-321-9044 Fax: 214-321-5304
james.whitsitt@globalequipmentandfinance.com

 

Send mail to jack@dwracinggraphics.com with questions or comments about this web site.
Copyright © 2006 DW Racing Graphics
Last modified: Thursday October 26, 2006